Thursday, September 23, 2010

George Washington Bridge Toll Cost 2010

THE ACADEMIC PROGRAM

Each student presented for consideration a low-cost item in a multiple produced by industry. As a group, they themselves were responsible for choosing the better chance of being favored metal brads.
From at least 50 units, each student developed a three-dimensional configuration with this material.



0 comments:

Post a Comment